Multi-sensor drone projecting blue laser scanning lines across waterproofing membrane and flashing on a building facade under construction
← Before it disappears

Type 10 · Envelope & facade

Water finds the one lap nobody flew past

Waterproofing and air barrier continuity, flashing laps, window and curtain-wall installation, sealant joints, cladding attachment and roofing details — scanned in blue laser and radiometric thermal from the outside of the building, before cladding covers it and before the first leak call.

The system

Fly the elevation → compare → thermal → exception list

01

Elevation flight

Each face flown at fixed standoff, in overlapping passes, at full facade resolution.

02

Detail compare

Flashing, laps, joints and anchors compared to the envelope details on the drawings.

03

Thermal sweep

A radiometric pass finds trapped moisture, insulation voids and air leakage paths.

04

Exception list

Findings pinned to elevation, level and gridline and sent to management only.

Glazing · curtain wall

Every joint on the elevation, measured from the air

The drone holds a fixed standoff and works the elevation panel by panel: joint width at every mullion, panel alignment and plane deviation across the face, gasket seating, anchor and clip condition, and the perimeter sealant bead. Window units are measured against the rough openings recorded earlier, so a unit that will not seal is known before it is glazed and caulked.

  • Joint widthMeasured at each mullion
  • Panel alignmentPlane deviation across the face
  • Anchors & clipsPresence and engagement
  • SealantBead width, depth and tooling
  • AccessNo swing stage, no rope crew
Drone laser measuring curtain wall panel joints and perimeter sealant on a glass facade
Joint 1⅛" (spec ¾")
Plane ½" out at L5
Scanning

Cost of not catching it

Envelope and water-intrusion claims are among the costliest defects in commercial construction — remediation happens after occupancy, through finished interiors, with a tenant in the building. Catching a mis-lapped flashing while the scaffold is still up is the difference between a day of labour and a multi-year claim.

Coverage

Every envelope check, and the sensor that makes it

Envelope and facade inspection coverage matrix
InspectionWhat is verifiedSensor
WaterproofingMembrane coverage, laps, terminations and pinholes before coverHigh-res RGB
Air barrier continuityUnsealed transitions, gaps and missed laps across the wallRGB + thermal
FlashingHead, sill, jamb and through-wall flashing installed and lapped correctlyMacro RGB
Window installationRough opening size, squareness, shimming, anchorage and perimeter sealLiDAR + RGB
Curtain wallPanel alignment, joint width, gasket seating and anchor conditionLiDAR + RGB
Sealant jointsJoint width, depth, backer rod and tooling qualityMacro RGB
Cladding attachmentClip spacing, fastener pattern and panel engagementRGB + computer vision
Facade flatnessBow, bulge and plane deviation across the elevationLiDAR deviation map
Roofing detailsMembrane laps, penetrations, curbs, drains and edge terminationsRGB
Roof drainagePonding areas and slope to drain, measured off the surface modelLiDAR volumetric
Thermal moisture scanTrapped moisture and insulation voids in roof and wall assembliesRadiometric thermal
Parapets & copingsCoping joints, fastening and counterflashingRGB + LiDAR
Progress by elevationWhat is weather-tight, elevation by elevation, by dateRGB progress capture

Sample output

The envelope exception list, by elevation and level

LocationChecked itemSpecDrone measuredStatus
North elev. · L6Air barrier at slab edgeContinuous, lappedUnsealed transition, 22 ft runFix now
Window 6-14Head flashing lapOver the WRB, 4" minTucked behind WRBFix now
Roof · Bay 3Thermal moistureDry assembly1,850 sq ft anomaly, wet signatureFix now
West elev. · L4Curtain wall joint width¾" ± ⅛"1⅛" at 3 jointsFix now
Roof · NESlope to drain¼" per ftPonding, 0.4 in depthReview
South elev.Facade plane deviation≤ ½" in 20 ft¾" bulge at L5Review
East elev. · L2Cladding clip spacing24" O.C.24" O.C. confirmedPass

Illustrative report format. Thermal anomalies carry the radiometric image and the area, so the roofer knows exactly what to cut and test.

What it costs when nobody's watching

Facade work is where people fall — and where the coverage gap is widest.

389

fatal falls in U.S. construction in 2024 — 38% of all construction fatalities, and 95.9% of them falls to a lower level.

Source: BLS, Census of Fatal Occupational Injuries 2024 (released Feb 2026)

10–15% vs 90–100%

of a facade reachable from a scaffold setup, against what a single drone pass covers in the same engagement.

Source: Aerially.ai; iScano (vendor sources)

$4K–$12K vs $37K–$75K

drone facade inspection against scaffolded inspection on a 15-story tower — a 60–80% reduction.

Source: iScano, 2026 — vendor pricing, not a third-party audit

$35K–$42K · $1.3M+

direct cost of one lost-time construction injury, and the cost of a single fatal work injury.

Source: National Safety Council, Injury Facts

5–9% vs $150,000+

roof repair cost when moisture is found early, against a full membrane replacement once it spreads.

Source: Aerially.ai roof/facade cost guides — industry marketing figure, not an audited statistic

ASTM C1153

the standard practice our radiometric roof moisture sweeps are flown and read against.

Source: ASTM International

Government-grade sources (BLS, OSHA, NIST/NIBS) are cited as published. Industry research (Arcadis, FMI/Autodesk, CII, NSC) is survey- and estimate-based. Vendor case studies and vendor pricing pages are labeled where used and should be read as documented examples, not industry averages.

Ready to schedule a flight?

Order a scan or speak to our sales team

Click to reveal our direct sales email.